Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The San Diego Owner’s Guide
CGI-compatible framing hardware, structural connectors, and ADU-specific fastening systems for San Diego homes typically run $53,100-$153,400 installed for a full addition, with component-level repairs starting around $470. We stock the full range of CGI structural brackets, post bases, and lateral-load hardware on our San Diego trucks, and most standard replacements can be sourced within 24 hours. Most homeowners discover a CGI component has failed when they spot rust streaking on exposed steel hardware after our marine-layer mornings, or when a permit inspector flags a corroded connector during an ADU rough-in that won’t pass until it’s swapped.
Which CGI Models This Applies To
CGI, or California’s standard cold-formed galvanized steel framing and connector systems, isn’t a single brand name stamped on a box - it’s a specification family used across Simpson Strong-Tie, ClarkDietrich, and Marino\WARE products that San Diego architects specify for ADUs and additions to meet Title 24 energy code and seismic requirements. The critical identifier is the gauge stamp: 18-gauge for non-structural partition walls, 14-gauge for load-bearing ADU framing, and 12-gauge for moment-frame connections in two-story additions. We see the most confusion with post bases: the CBSQ series (concrete-to-steel) and ABU series (adjustable base) look identical from three feet away but carry different uplift ratings, and San Diego’s hillside zones require the heavier spec. Our crews carry both, but we’ll check your permit set or the stamped hardware itself before we quote - no guessing. Rowan Construction Group San Diego is an independent contractor, not affiliated with CGI or any manufacturer; we source what the engineering calls for and document the mill certificate.
Signs Your CGI Home Additions & ADU Is Failing

- Rust bleeding on galvanized surfaces - San Diego’s salt air, especially within two miles of the coast in Point Loma or Pacific Beach, accelerates galvanic corrosion on any scratch or field-cut edge. What looks like surface staining often indicates the zinc layer has failed and the steel beneath is section-lossing.
- Visible gap at beam-to-post connections - The bolted or screwed joint has loosened, usually from seasonal wood shrinkage in the adjacent lumber or from undersized fasteners specified before 2015 NDS updates. The connector itself may be fine, but the assembly is no longer transferring load as designed.
- Cracked stucco or drywall at ADU corners - This tracks back to missing or failed hold-downs (HTT, HDU series) that let the wall rack slightly in wind or quake. The finish cracks before the structure fails, which is the point of the warning.
- Squeaking or popping sounds during Santa Ana winds - Fasteners working in oversized holes, typically from using structural screws where bolts were specified, or from corrosion-worn holes in coastal installations. The connector hasn’t let go yet, but the slip is audible.
- Permit rejection at rough inspection - The most expensive symptom. San Diego’s Development Services Department enforces current CBC connector schedules strictly; a 2018-spec HDU2 where a 2022 HDU5-SDS2.5 is now required means full removal and replacement, not a field fix.
Before
AfterReplacement Cost & What’s Included
| Component / Scope | San Diego Price Range |
|---|---|
| Single connector replacement (post base, hold-down, strap) | $470-$2,125 |
| Partial ADU framing repair (multiple connectors, localized) | $5,900-$16,520 |
| Full ADU structural connector package | $10,620-$33,040 |
| Complete home addition (CGI framing system, installed) | $53,100-$153,400 |
| Garage conversion to ADU with CGI upgrades | $35,400-$94,400 |
What moves the number: access (crawling a Mission Hills hillside foundation vs. a flat Del Cerro slab), whether the failed connector damaged adjacent framing that now needs sistering, and permit status - we’ll pull the permit and schedule inspection, or work from your existing permit if it’s active. Every quote is flat, written, and includes the photo record of condition before we start. Under Clause 1 of the Haven Standard, that price is locked; if we find something unexpected, we stop, document it, and write a change order - no work proceeds unsigned.
DIY or Call Us?

There’s a safe middle ground here, and then there’s where we step in. An owner can verify the stamp on a connector, measure bolt spacing with a tape, and photograph corrosion for documentation - that’s useful information that speeds our quote. What goes wrong fast: cutting or drilling galvanized steel without proper PPE (zinc oxide fumes), torqueing high-strength bolts without a calibrated wrench, or swapping a like-looking connector for one with a lower load rating because the box was cheaper. Structural connectors are life-safety hardware; they’re engineered to fail in a specific way under specific loads, and the wrong spec in a San Diego seismic zone isn’t a maintenance issue, it’s a code violation that can void your permit. We carry Simpson Strong-Tie, MiTek, and ClarkDietrich stock on our San Diego trucks, and we’ll match your spec exactly - “measure twice, document once, then we can talk price.” Call (858) 434-8926 to schedule your free estimate.
FAQs
Galvanized steel connectors in inland San Diego typically last 40-60 years; within a mile of the coast, salt-air exposure can cut that to 20-30 years, especially on south-facing exposures that never fully dry. We inspect for section loss, not just surface rust, and we’ll show you the difference in our photo record. Call (858) 434-8926 for an exact quote - estimates are free.
No - once the galvanized coating is breached and rust has penetrated the steel section, the load rating is compromised and cannot be restored in the field. Paint-over or rust converter is a cosmetic fix that inspectors will reject and engineers won’t sign off on. Replacement is the only code-compliant path. Call (858) 434-8926 for an exact quote - estimates are free.
A single post base or hold-down replacement in accessible framing takes 2-4 hours; a full ADU connector package on an active build takes 1-2 days, plus inspection scheduling. We coordinate San Diego Development Services inspections as part of our scope, not yours. Call (858) 434-8926 for an exact quote - estimates are free.
We stock standard Simpson Strong-Tie and ClarkDietrich connectors for 14-gauge and 12-gauge ADU framing on our San Diego trucks; specialty moment-frame hardware or oversized post bases for two-story additions typically source next-day from the Oceanside or Los Angeles distribution center. We’ll confirm availability when we write your quote, not after we start. Call (858) 434-8926 for an exact quote - estimates are free.
Ready to get a written price before anyone picks up a tool? Call Rowan Construction Group San Diego at (858) 434-8926 to schedule your free estimate. We’ll review your permit set or existing structure, match the exact CGI spec your addition or ADU requires, and deliver a flat written quote with our 365-Day Done Right Promise - if it’s not done right, we make it right, backed by The Haven Standard, not a handshake.
Written by Grant Rowan, Owner, Rowan Construction Group San Diego at Rowan Construction Group San Diego, serving San Diego and nearby areas.







Before
After
Before
After
Before
After